Repair of more than one hundred subsea concrete piles by adding new fiber covers and epoxy mortar pumped from the dock and structural elements located above sea level and below the pier were also repaired.
The repair work on the steel reinforcements and chipped concrete was carried out on floating platforms pumping high-strength mortar from the dock.